FM 494
FM 494 Roadway Improvement Limits: From Sh 107 To: FM 676 (Mile 5) Construction and widening of a non- freeway facility consisting of: For the grading, storm sewer. And drainage structures, concrete curb and gutter, lime treated subgrade, flex base, asphaltic concrete pavement, wheelchair ramps, sidewalks, pavement markings, signing and traffic signals. https://youtu.be/Gk_MW0QWd0khttps://youtu.be/35lxhhBDjFE









