FM 802 State Highway Improvement

Limits: From FM 1847 to Old Port Isabel Rd.

This project consisted of the reconstruction and widening of a non-freeway facility, expanding it to four lanes to improve traffic flow and capacity.

The scope of work included grading to prepare the site for construction, followed by the application of a lime-treated subgrade to stabilize the soil. A flexible base was installed to provide a solid foundation, and the roadway was paved with durable asphalt.

Key infrastructure improvements included the construction of culvert structures to manage water flow and prevent flooding. Riprap was placed in strategic areas to protect against erosion.

This reconstruction and widening project resulted in a more efficient roadway that can accommodate increased traffic volumes and support future growth in the area.