Mile 6 West Rd. Roadway Improvement
Limits: From Mile 9 to Mile 11
This project focused of the reconstruction of an existing roadway, involving a full-depth reconstruction to restore and improve the roadway’s structural integrity and longevity.
The scope of work included grading to prepare the site, followed by cement treatment of the subgrade to stabilize the underlying soil. A cement-treated flexible base was installed to provide a strong foundation, and the roadway was repaved with asphalt.