FM676 (Mile 5) State Highway Improvement
Limits: From Taylor Rd. to FM 2220 (Ware Rd.)
This project includes the construction and widening of FM 676 (Mile 5) from a 2-lane roadway to a 4-lane divided highway. The expanded roadway is designed to improve traffic capacity and safety in the area.
The scope of work includes comprehensive grading to prepare the site, the installation of a lime-treated subgrade for soil stabilization, and the application of a flexible base to support the new roadway structure. The pavement will be constructed with durable asphalt concrete.
Play Video